About us

Further information

The application for Oaklands Solar Farm has now been submitted and accepted by Planning and Environment Decisions Wales (PEDW).

All relevant information and application documents can be viewed on PEDW’s website. All correspondence related to the application should now be directed to PEDW as it considers the application, prior to making a recommendation to Welsh Ministers.

Draft planning application

Application

Document Schedule
Application Form
Acceptance of Notification Letter

Drawings 

SRE1113/02/01Site Location Plan
SRE1113/02/02Planning Application Boundary
SRE1113/02/03Site Layout
SRE1113/02/04Substation BESS Compound Arrangement
SRE1113/02/05PV Panel Details (pile and Sleeper)
SRE1113/02/06DNO Substation Detail
SRE1113/02/07Solar and BESS Switchgear Cabin Details
SRE1113/02/08Transformer Station (Solar) Details
SRE1113/02/09Spares Cabin Details
SRE1113/02/10Container Details
SRE1113/02/11Battery Module Details
SRE1113/02/12Battery Transformer Inverter Details
SRE1113/02/13Battery Firewall Details
SRE1113/02/14Point of Connection Details
SRE1113/02/15Section through Substation and BESS Compound
SRE1113/02/16Fencing and Security Details
SRE1113/02/17Internal Access Track Construction Detail
SRE1113/02/18Landscape Mitigation Plan
SRE1113/02/19Palisade Fencing Details
SRE1113/02/20Deer Mesh Fencing Details
SRE1113/02/21Acoustic Fence Details
SRE1113/02/22Site Access Details
SRE1113/02/23Site Access Construction Details
SRE1113/02/24Temporary Site Set Down Area Details
SRE1113/02/25Indicative 132kv Substation Details
SRE1130/02/26Site Setting

Supporting documents

Planning Statement 

Design and Access Statement

Welsh

English

Environment statement

Environmental Statement Vol 1
Non-Technical Summary

ES Volume 3: Technical Appendices 

1.1Screening Direction
1.2Scoping Direction
6.1Agricultural Land Quality Report
6.2Glint and Glare Assessment
6.3Outline Construction Environmental Management Plan
7.1LVIA Methodology
7.2Landmap Aspect Area
7.3

LVIA Figures

Figures 7.1-7.2
Figures 7.3-7.6
Figures 7.7-7.8
Figures 7.9-7.10
Figures 7.11-7.13
Figures 7.14-7.15
Figures 7.16-7.17
Figure 7.18

7.4

Photomontages

VP1-VP2
VP3-VP4
VP5-VP6
VP7-VP10
VP11-VP17
Tech Methodology Part 1
Tech Methodology Part 2

7.5LVIA Tables
8.1 to 8.8Noise Figure
8.1 to 8.8Basic Acoustic Terminology
8.1 to 8.8Noise Survey Details
8.1 to 8.8Baseline and Noise Survey Results
8.1 to 8.8Plant Inventory Noise Levels
8.1 to 8.8Noise Mapping Results
8.1 to 8.8Vibration Technical Terms
8.1 to 8.8Vibration Monitoring Details

9.1 part 1

9.1 part 2

Heritage Desk Based Assessment

9.2 part 1

9.2 part 2

Geophysical Survey

9.3 part 1

9.3 part 2

9.3 part 3

9.3 part 4

Evaluation Trenching
9.4ASIHDOL
10.1Flood Consequences Report
11.1Ecology Survey Results

11.2 part 1

11.2 part 2

Biodiversity Net Gain Report & Calculations

12.1 part 1

12.1 part 2

12.2

Traffic Statement

Construction Traffic Method Statement

12.3Sensitive Receptors Location Plan
14.1Battery Storage Fire Safety Statement

Consultation 

Other

Scoping 

Scoping Report

– Appendices to Scoping Report can be found on the Planning and Environment Decisions Wales website here.

If you have any queries about the contents of this page, please get in touch.